Judd House, Mora Street, EC1 – CAT A Fit Out

In January we successfully completed all electrical and associated works relating to the CAT A fit out of 3 floors of future workspace at Judd House, Mora Street EC1.

We were contracted by Thirdway Contracts on this project which was completed within a 20 week construction programme. The design saw the building stripped back exposing the brickwork with all new engineering services on show including exposed galvanised steel cable tray and conduits. Surface, recessed and suspended LED architectural lighting systems, emergency lighting, fire alarms, security systems, new distribution systems and lightning protection systems.

Project Information
Client: Confidential
Project Duration: 20 Weeks
Main Contractor: Thirdway Contracts

Paul Earl Team
Project Manager: Tom O’Donnell
Site Manager: Luke Facer
Cost Manager: Lee Matthews

Services Provided
Electrical Installation, Power, Containment including Galvanised Conduit features and Galvanised Skirting Systems, Suspended LED Architectural Lighting, Feature Stairwell Lighting, Main Switch Panels and Distribution, Fire Alarm System, Intruder Alarm and Access Control