Paul Earl have undertaken the installation of a number of electric vehicle chargers at 3 different locations for our key client.
Project Requirements:
The key requirement for the client on these chargers was the ability to charge the vehicles at a fast rate, and as such Paul Earl have deployed both AC and DC charging at the sites. The AC chargers utilised were the Easee 22kw variant, and for DC we have installed the Schneider EVD 24Kw models.
Key Features:
Working alongside our backend software partner, Flexible Power Systems, these chargers enabled the charging patterns of the vehicles, along with real-world usage data, to be modelled for journey scheduling and planning. Full RFID authorisation limits the usage of the chargers to only those the client wishes to have access.