Earlier this year we were appointed by 8Build to carry out the electrical installation relating to the CAT B fit out of 2 floors of workspace at 20 Soho Square.
The project completed end of May 2020 following a 20 week fit out programme. The project comprised the fit out of levels 5 and 6 of office workspace, private offices and meeting rooms plus kitchens, break out areas and IDF rooms.
The design saw the building stripped back exposing the M&E services and brickwork, our works included the installation of surface, recessed and suspended LED architectural lighting systems, emergency lighting, exposed galvanised steel cable tray and conduits. Underfloor busbar power systems, floor boxes and desk mounted power outlets.
Project Information
Client: Confidential
Project Duration: 20 Weeks
Main Contractor: 8Build
Paul Earl Team
Project Manager: Matt Lovis
Site Manager: Ben Blackburn
Cost Manager: Cian Morgan-Smith
Services Provided
Electrical Installation, Underfloor Power Systems, Exposed Containment, Pendants and Suspended LED Architectural Lighting Systems, Emergency Lighting, Modifications to Switch Panels and Distribution Systems.