We were recently contracted by our client ISG Plc to complete the electrical and associated works relating to the CAT A fit out of 70,000 sq/ft of contemporary workspace over 8 Floors at 12 Arthur Street, London .
The project took place over a 20 week construction programme and consisted of the open office fit out to CAT A including new LED lighting throughout including core areas, toilets, shower rooms, lift lobbies, basement bike stores and staircases. New containment throughout and also modification works to existing mains distribution systems.
Project Information
Client: 12 Arthur Street
Project Duration: 20 Weeks
Main Contractor: ISG Plc
Paul Earl Team
Project Manager: Chris Foote
Assistant Project Manager: Liam Hall
Site Manager: Ben Prince
Cost Manager: Aiden Coyle
Services Provided
Electrical Installation, Power, Containment, Recessed LED and Suspended LED Architectural Lighting including Modular Wiring Systems, Lighting Control Systems, Modifications to Switch Panels and Distribution Systems.