34 – 38 Provost Street, Shoreditch

We’re really pleased to announce completion of our recent project at Provost Street for Thirdway Contracts, a job we are extremely proud of. The project consisted of the complete strip out and refurbishment of five floors with the addition of two new floors to the roof. As part of works we installed all new electrical infrastructure and finished services to CAT A with surface steel conduit and containment systems as well as suspended lighting systems throughout. Also part of our contract works were the fire and security systems for the building.

Project Information
Client: IVRE
Project Duration: 20 Weeks
Main Contractor: Thirdway Contracts

Paul Earl Team
Project Manager: Chris Foote
Site Manager: Lewis McDonnell
Cost Manager: Cian Morgan-Smith
Design Engineer: James Anderson

Services Provided
Electrical Design and Installation, Power, Containment including Galvanised Conduit features and Galvanised Skirting Systems, Underfloor Busbar Systems, Suspended LED Architectural Lighting, Main Switch Panels, Fire Alarm System, Intruder Alarm and Access Control

About Us

We have been delivering quality to our clients projects for over 50 years.

Recent Posts

Video